Due to funding constraints, this project’s construction scope has been scaled back. As part of the preferred alternative presented to the public, DOT will be constructing two roundabouts. One will be at Mendenhall Loop Road and Stephen Richards Memorial Drive, and the other will be at the Floyd Dryden intersection. As funding becomes available, the rest of the project proposed under the preferred alternative will be pursued.
Public meetings were held in November 2013, July 2014, and May 2017. Review the November 2013 comments.
Revised concept alternatives were presented at the July 8, 2014 public meeting. These alternatives consist of:
The concept alternatives include the “A Family”, which is a five lane roadway, and the “B Family”, which is a three lane roadway with roundabouts and/or widened signalized intersections.
The July 8, 2014 public meeting materials, including the poster boards, PowerPoint presentation concept overview and “A” and “B” concept alternative maps, can all be accessed on our Project Documents page.
In May of 2017, a public meeting was held introducing the preferred alternative based on comments from the previous meetings. The preferred alternative is a 3-lane road section with roundabouts at Steven Richards, Floyd Dryden and Mendenhall Boulevard; and can also be found on the documents page.
The tentative schedule for completing the project is as follows: