Juneau - Egan Drive Resurfacing 10th Street to Main Street
    
        Federal Project #NHS 093-2(47) / 
        State Project #69393 & #69450
        The purpose of the proposed project is to improve transportation safety on Egan Drive for motorized and non-motorized traffic and to prevent failure of the retaining wall on Egan Drive near Merchants Wharf. 
See Construction Information 
Current Project Information
 
On March 27, 2019, DOT&PF  awarded a $14.3 million project to SECON to  resurface Egan Drive from 10th Street to Main Street and enhance pedestrian and  bicycle facilities. 
The project will:
 
- Resurface Egan Drive from 10th Street to Main Street
 
- Improve and add pedestrian crossing opportunities by reducing the number 
   and/or width of driving lanes
 
- Widen sidewalks
 
- Construct bike lanes
 
- Repair sections of retaining wall under the Merchant’s Wharf building
 
- Rehabilitate the Gold Creek Bridge (incl. asphalt, rails and signs)
 
- Slip lining some existing culverts
 
- Widen Egan Drive seaward with a reinforced soil slope approximately 1,300 linear feet between West Eighth Street and Whittier Street
 
- Remove and replace storm drainage systems that drain into Gastineau Channel
 
- Relocate electrical and telephone utility boxes impacted by the project
 
- Replace luminaires and traffic signals including electrical conduits
 
- Replace signs and install new way finding signs to direct pedestrian and bicycle traffic
 
Project Status and Schedule
  - Activities in summer 2019 focused on the stretch of Egan Drive between Willoughby and Whittier streets.
         
  - Road construction has resumed with the focus on finishing the section between 10th and Whittier streets, and repairing the retaining wall under the Merchant's Wharf building.
         
This page last updated: 4/13/20