The Alaska Department of Transportation & Public Facilities (DOT&PF) is working on a design to improve and resurface approximately 2.5 miles of Douglas Highway from St. Ann's Avenue to Egan Drive including upgrades to the roundabout and bridge surface. The project will repair various elements of the existing road infrastructure such as sidewalks and curbs, culverts and drainage, and signage.
The primary objectives of the project are:
This project is funded by federal receipts through the Preventative Maintenance program. The project is expected to cost approximately $15-20 million (including utility relocations, Right-of-Way acquisition, and construction costs).
Use DOT&PF's Alaska Project Exchange tools to learn more about all of DOT&PF's active construction projects statewide!