The Alaska Department of Transportation and Public Facilities (DOT&PF) is planning to improve safety, reduce maintenance costs, and address operation logistics on the General Aviation (GA) East Ramp Apron and associated Taxiways C, D, and W of the Fairbanks International Airport (FAI).

This project was planned in the 2019 FAI Eastside Master Plan and it’s anticipated to impact approximately 52 acres of paved surface.

Over the next 6 months, the project team will be conducting environmental permitting and design to produce bid documents for summer 2023 construction.

Project Status


DOT&PF is working on the engineering and environmental permitting required to complete a Categorical Exclusion under the National Environmental Policy Act (NEPA), which is required for this project. A public meeting is being planned for August 25, 2022. Completed reports and other relevant information on the project can be found in the documents section.

Project Documents


Contact Us


Send us your comments, questions or concerns:

  • RJ Stumpf, P.E.
  • Airport Engineer
  • 2301 Peger Rd
  • Fairbanks, AK 99709-5316
  • Email: rj.stumpf@alaska.gov
  • Phone: 907.474.2587

The Alaska Department of Transportation & Public Facilities encourages you to use this website to:

  • Provide input to the project team.
  • Stay up to date as the project further develops.
  • Keep a lookout for any upcoming project meetings which may be posted on this webpage or found in local advertisements.