How did this project get started?
In 2010 residents voiced concerns to elected officials about pedestrian safety, especially for children, who utilize the road for walking, riding bikes and catching school busses.
In 2011 and 2014 the legislature appropriated state funds for the design and construction of a pedestrian/bicycle facility along Chena Small Tracts.
What is the scope of this project?
The scope of the project is to "Construct a facility along Chena Small Tracts Road from the existing Chena Pump Road path to the FNSB Chena Kiwanis Park to accommodate bicycles and pedestrians".
What is the current proposed design?
The current design is a 8-foot wide paved separated path on the North Side of Chena Small Tracts Road.
When will the project be constructed?
Summer 2015.
Design Study Report | Design Study Report Revisions |
Environmental Document | |
Final Plans | |
| |
If you have any questions or comments about the project, please contact: Russ Johnson, P.E.
|