Coastal and Harbor Design Procedures Manual
Revised September 3, 2004

All chapters arePDF format and are less than 1 MB, unless otherwise noted.

Questions About Coastal and Harbor Design Procedures Manual?
Michael Lukshin, State Ports and Harbors Engineer,
Phone: 465-3979

Section/Chapter Effective
Date

Manual Cover
Introduction
Table of Contents
05/27/03
12/01/02
09/03/04

1. Determine Basin Area 12/31/01
2. Determine Basin Depth 12/31/01
3. Obtain Existing Design References 12/31/01
4. Identify All Potential Sites 12/31/01
5. Visit Site-Apply Matrix 12/31/01
6. Evaluate and Select Site(s) 12/31/01
7. Perform Field Investigations 12/31/01
8. Analyze Meteorological Conditions 12/31/01
9. Determine Instrumentation Needs 12/31/01
10. Identify Water Level Variations 12/31/01
11. Perform Deep Water Wave Analysis 10/15/02
12. Analyze Wave Transformation 10/15/02
13. Identify Currents 10/15/02
14. Evaluate Sedimentation and Littoral Processes 10/15/02
15. Develop Inner Harbor Wave Criteria 03/01/03
16. Develop Harbor Layout 09/03/04
17. Explore Breakwater Alternatives 12/31/00
18. Develop Uplands 12/27/02
19. Boat Handling/Haul-Out 12/01/02
20. Plan Waste Handling Facilities 12/05/02
21. Utilities 02/11/03
Appendices
10/15/02
10/15/02
11/21/02
  •  D. TBD*
TBD*
  •  E. TBD*
TBD*
  •  F. TBD*
TBD*
  •  G. TBD*
TBD*
10/15/02
12/01/02
    *To Be Determined
DOT&PF Error Page Skip to content

Oops!

The file you have requested cannot be found. Sorry for the inconvenience.

To find what you're looking for, please use the search feature at the top right of this page or see below for commonly visited pages.

DOT&PF home page

Alaska Marine Highway System (AMHS)

Highways related information

Aviation related information

Procurement

Divisions / Sections / Programs

Regions