As of 04/26/2024 12:44 AM AKDT
This page lists upcoming DOT&PF development solicitations for highways, airports, buildings, and marine facilities, detailing expected engineering, architectural, planning, and other services. Unless otherwise stated, current project plans and specifications are generally unavailable at this time.
Please note that non-construction professional service agreement RFPs are not included on this site. For active solicitations, refer to the RFP bid calendar link.
A free BidX account is necessary to view RFP bid documents. New users can register for an account here BidX Sign Up.
Companies bidding on Construction-Related Professional Services RFPs must be listed on the AASHTOWare Project Vendor List to be eligible. To be added to the AASHTOWare Project Vendor List Click here and follow these instructions.
Click here to generate an Excel file of the report below.
Region(s):Engineering Services
more >Professional services to prepare the Alaska Traffic Manual Supplement and Alaska Sign Design Specifications to support Alaska’s adoption of the 11th Edition of the Manual on Uniform Traffic Control Devices.
more >Phase 1 – Pre-Construction Services: CMGC Contractor to aid during functional design efforts specific to the vessel hull and other systems with exception of the Propulsion System and Vehicle Elevator and Turntable System, this will include providing industry expertise on identifying and implementing innovative solutions, risk management, constructability evaluation, and development of construction cost and schedule information. Phase 2 – Construction: The Contractor will manufacture, acquire, validate, deliver, provide installation support and provide commissioning support.
more >Design Engineering Services
more >Professional planning services to lead and develop the City of Whittier Transportation Master Plan (TMP). The goal of the TMP is to coordinate with other organizations, such as, but not limited to, the Alaska Railroad Corporation, Chugach Corporation, Tribal Organizations within the surround area, Huna Totem, Barge and Tourist Companies, and others focused on transportation planning and project development within or near the City of Whittier. The TMP will include project management; data assembly and coordination with organizations planning or developing projects in or near the City of Whittier; documentation of existing conditions; needs analysis; public involvement; project recommendations; and a final report.
more >Professional electrical engineering design services for the replacement of airfield lighting system, as needed to support the in-house design of the Hoonah Airport Rehabilitation
more >The Contractor shall conduct a Value Engineering Study for the Seward Hwy: Milepost 25.5-36, Trail River to Sterling Wye Rehabilitation project, providing a Value Engineering Team consisting of a Team Leader and Team Members. The Team Leader shall be a Certified Value Specialist (or demonstrate comparable experience and expertise), and Team Members shall have experience in disciplines appropriate for the variety of elements associated with the project conditions. The Contracting Agency can supply two to three in-house employees or consultant design team members currently under contract with bridge design, highway design, and construction experience to supplement the VE team’s expertise and can also provide meeting room space. The duration of team study is expected to be five days, in or around June of 2024. The study will follow the Value Engineering (VE) Process as described at the following link: http://www.fhwa.dot.gov/ve/veproc.cfm. The Contractor shall prepare a final report of the team’s recommendations three weeks after the team study.
more >Professional services to provide passive seismic surveys for multiple statewide bridges capable of producing data to a depth pf 150 feet below the ground surface.
more >Professional coastal engineering evaluation services with accurate and reliable estimates of erosion occurring along the coastlines of Alaska for various capital improvement projects.
more >Professional hazardous waste & environmental services to aid in the construction of various capital improvement projects.
more >Extend security fence to enclose airport including runways and terminal and tie into existing fence.
more >Design Services
more >Rehabilitate the existing airport trench drains. Drains are near the terminal, north of the SIDA, and across Taxiway B. The drains north of the SIDA to be extended to the mid ramp to assure optimal drainage. Extend the east side midfield trench drains to the center of the airport ramp. Repave the East Ramp and resurface to concrete pad on the north side of the apron. Mill and pave the east side of the apron. Also mill and pave the concrete pad on the north side of apron.
more >The Contractor shall provide professional services that may include Environmental Activities, Surveying and Mapping Services, Geotechnical Investigations/Recommendations, Hydraulic/Hydrologic Design, Traffic and Safety Analysis, Reports and Memoranda, Public Involvement, Erosion and Sediment Control Plan, Plans, Specifications and Engineers Estimate, Utilities, ROW Appraisal and Acquisition, Assistance During Bidding, Assistance with Design Project Closeout, and Assistance During Construction.
more >The Contractor shall provide professional design services to extend the southern parallel taxiway from Taxiway F to Taxiway C, reconstruct the Taxiway C interlink, reconstruct Kulis Taxiway, and tie into the Kulis Apron.
more >The project proposes to construct an apron expansion to include four (4) concrete hardstands for Airplane Design Group (ADG) VI aircraft and associated taxiways for airfield access. Other construction activates will include aircraft ground power system, ramp lighting, realignment of Point Woronzof Road, construction of building(s) to house both AFM equipment and ground handling break room, snow storage area, GSE parking area, a storm drain system, a tug road extension, relocation of the airport security fence, lighting, striping, signs, drainage improvements, utility adjustments or relocations as necessary and extension of fuel hydrant system by others.
more >The Contractor shall provide professional design services that may include Environmental Activities, Surveying and Mapping Services, Geotechnical Investigations/Recommendations, Hydraulic/Hydrologic Design, Traffic and Safety Analysis, Reports and Memoranda, Public Involvement, Erosion and Sediment Control Plan, Plans, Specifications and Engineers Estimate, Assistance During Bidding, Assistance with Design Project Closeout, and Assistance During Construction.
more >Design
more >Design
more >Design
more >The Contractor shall provide independent cost estimator services for the subject project.
more >The Contractor shall provide professional services to rehabilitate Taxiways (TW) Romeo South from TW Papa to TW Kilo and TW Lima from TW Romeo to TW Echo. Anticipated improvements include: provide adequate typical section; remove and replace asphalt, evaluate taxiway safety area; replace lighting, markings, and signs; remove, replace and modify existing storm drainage; and adjust utilities as needed.
more >Engineering Services
more >The Contractor shall provide professional electrical engineering supporting the rehabilitation of operational surfaces and access road, replace lighting system, install erosion protection around Runway 20 (northwest end), widen the runway for better wind coverage, relocate primary wind cone and segmented circle, and add new visual aids (supplemental wind cone and threshold markers).
more >Design Engineering Services
more >