{"@odata.context":"https://akdotpf-pr-prod-amsv4.infotechinc.com/$metadata#Proposals(Letting(LettingDate,BLDT2,LettingStatus),PrimaryRefDistrict(Description),Projects(PJSST8,PROPOSEDWORK,Description,PJNUM5),Addendums(AddendumNumber,DateApproved))","value":[{"Name":"25272006","Description":"Chuathbaluk Airport Rehabilition Geotechnical Services","LongDescr":"The Alaska Department of Transportation & Public Facilities (Alaska DOT&PF) is rehabilitating the airport in Chuathbaluk, Alaska. The Contractor shall provide professional Geotechnical Investigation Engineering services in support of this project designed in house. The consultant is to provide field analysis in support of the CRM engineer’s recommendations.  The fieldwork requires a Civil Engineer and Geologist (or closely related degree) with experience having performed geotechnical investigations in remote locations.  Drilling is not anticipated for field work activities. No recommendations are to be included in the geotechnical report.","StateProjectNumber":"CFAPT01223","FederalProjectNumber":"AIP 3-02-XXXX-XXX-20XX","PRLST1":null,"Id":2630,"PRQTY1":null,"PRNUM3":null,"ProposalItemTotal":1,"Addendums":[],"Projects":[{"Description":"Chuathbaluk Airport Rehabilition Geotechnical Services","PJSST8":null,"PJNUM5":"","PROPOSEDWORK":"The consultant is to provide field analysis in support of the CRM engineer’s recommendations.  The field work requires a Civil Engineer and Engineering Geologist (or closely related degree) with experience having performed geotechnical investigations in remote locations. Drilling is not anticipated for the field work activities.  No recommendations are to be included in the geotechnical report."}],"Letting":{"LettingDate":"2026-07-17T00:00:00-08:00","LettingStatus":"S","BLDT2":"2026-07-10T09:40:00-08:00"},"PrimaryRefDistrict":{"Description":"Central Region"},"Community":"","OJT":"None","addNumber":"","addDate":"","estRange":"Between $50,000 and $100,000","estRangeVal":2},{"Name":"25271001","Description":"Nunam Iqua Airport Improvements Construction Administration Services","LongDescr":"Professional construction administration services for the Nunam Iqua Airport Improvements project. Work will include complete field and office support for construction administration, on site construction administration, and project closeout in accordance with the Construction Manual.","StateProjectNumber":"NFAPT00368","FederalProjectNumber":null,"PRLST1":"NUNAM","Id":2617,"PRQTY1":null,"PRNUM3":null,"ProposalItemTotal":1,"Addendums":[],"Projects":[{"Description":"Nunam Iqua Airport Improvements Construction Administration Services","PJSST8":null,"PJNUM5":"","PROPOSEDWORK":"Professional construction administration services for the Nunam Iqua Airport Improvements project. Work will include complete field and office support for construction administration, on site construction administration, and project closeout in accordance with the Construction Manual."}],"Letting":{"LettingDate":"2026-07-20T00:00:00-08:00","LettingStatus":"S","BLDT2":"2026-06-26T11:00:00-08:00"},"PrimaryRefDistrict":{"Description":"Northern Region"},"Community":"Nunam Iqua","OJT":"None","addNumber":"","addDate":"","estRange":"Greater than $1,000,000","estRangeVal":8},{"Name":"25261034","Description":"Chena River Walk Stage III – Segment 1: H&H analysis","LongDescr":"Professional services for an H&H analysis for the Chena River Walk Stage III – Segment 1 project to help determine minimize design elevation and to help with permitting of the project.","StateProjectNumber":"NFHWY00280","FederalProjectNumber":null,"PRLST1":"FAIRB","Id":2601,"PRQTY1":null,"PRNUM3":null,"ProposalItemTotal":1,"Addendums":[{"AddendumNumber":1,"DateApproved":"2026-07-10T00:00:00-08:00"}],"Projects":[{"Description":"Chena River Walk Stage III – Segment 1: H&H analysis","PJSST8":null,"PJNUM5":"","PROPOSEDWORK":"Professional services for an H&H analysis for the Chena River Walk Stage III – Segment 1 project to help determine minimize design elevation and to help with permitting of the project."}],"Letting":{"LettingDate":"2026-07-22T00:00:00-08:00","LettingStatus":"S","BLDT2":"2026-06-23T11:02:00-08:00"},"PrimaryRefDistrict":{"Description":"Northern Region"},"Community":"Fairbanks","OJT":"None","addNumber":1,"addDate":"2026-07-10T00:00:00-08:00","estRange":"Between $50,000 and $100,000","estRangeVal":2},{"Name":"25272010","Description":"TAP: Palmer-Fishhook Separated Pathway: Trunk Road to Edgerton Parks Road Culture Resource Services","LongDescr":"The TAP: Palmer-Fishhook Separated Pathway: Trunk Road to Edgerton Parks Road project will construct a separated, paved, non-motorized pathway from Trunk Road to Edgerton Parks Road. This project may also include: grading, culverts, including fish passage improvements, improved ditching, roadside hardware, utility relocation, vegetation clearing, landscaping, and signs. \nThe Contractor shall provide Historic and Cultural Resources support for the project. Contractor services include: Historic and Cultural Resources and Initiation and Findings Letters. Contractor shall conduct a cultural resource investigation, including providing a cultural survey and determination of eligibility (DOE) for historic structures, compliant with Section 106 of the National Historic Preservation Act (36 CFR 800) and the Alaska Historic Preservation Act (A.S. 41.35.070), for the subject project.","StateProjectNumber":"CFHWY01216","FederalProjectNumber":null,"PRLST1":"PALME","Id":2634,"PRQTY1":null,"PRNUM3":null,"ProposalItemTotal":1,"Addendums":[],"Projects":[{"Description":"TAP: Palmer-Fishhook Separated Pathway: Trunk Road to Edgerton Parks Road Culture Resource Services","PJSST8":null,"PJNUM5":"","PROPOSEDWORK":"Contractor shall provide Cultural Resource services in support of the project."}],"Letting":{"LettingDate":"2026-07-28T00:00:00-08:00","LettingStatus":"S","BLDT2":"2026-07-14T15:00:00-08:00"},"PrimaryRefDistrict":{"Description":"Central Region"},"Community":"Palmer","OJT":"None","addNumber":"","addDate":"","estRange":"Between $100,000 and $150,000","estRangeVal":3},{"Name":"25273001","Description":"Naknek to King Salmon Non- Motorized Pathway","LongDescr":"Construct new sidewalk and widened shoulder for non-motorized traffic in Naknek & King Salmon, AK. Work\nincludes curb & gutter, asphalt sidewalk, recessed pavement markers, new signage & striping, drainage\nimprovements and topsoil/seeding.","StateProjectNumber":"SFHWY00706","FederalProjectNumber":"0380018","PRLST1":"NAKNE","Id":2627,"PRQTY1":null,"PRNUM3":null,"ProposalItemTotal":1,"Addendums":[],"Projects":[{"Description":"Naknek to King Salmon Non- Motorized Pathway","PJSST8":null,"PJNUM5":"","PROPOSEDWORK":"Design Services"}],"Letting":{"LettingDate":"2026-07-29T00:00:00-08:00","LettingStatus":"S","BLDT2":"2026-07-08T13:20:00-08:00"},"PrimaryRefDistrict":{"Description":"Southcoast Region"},"Community":"Naknek","OJT":"None","addNumber":"","addDate":"","estRange":"Between $250,000 and $500,000","estRangeVal":6},{"Name":"25272001","Description":"Continuing Alaska Aviation System Plan Phase IV","LongDescr":"The Alaska Department of Transportation & Public Facilities (DOT&PF) intends to issue an RFP for professional services with the objective of continuing the update of the Alaska Aviation System Plan (AASP). The primary purpose of the aviation system planning process is to examine the existing aviation system, update inventory information, analyze future trends and policy issues, and determine the type, extent, location, timing, and cost of airport development needs in the State of Alaska.","StateProjectNumber":"CFAPT01487","FederalProjectNumber":"3-02-0000-035-2026","PRLST1":null,"Id":2635,"PRQTY1":null,"PRNUM3":null,"ProposalItemTotal":1,"Addendums":[],"Projects":[{"Description":"Continuing Alaska Aviation System Plan Phase IV","PJSST8":null,"PJNUM5":"","PROPOSEDWORK":"The Alaska Department of Transportation & Public Facilities (DOT&PF) intends to issue an RFP for professional services with the objective of continuing the update of the Alaska Aviation System Plan (AASP). The primary purpose of the aviation system planning process is to examine the existing aviation system, update inventory information, analyze future trends and policy issues, and determine the type, extent, location, timing, and cost of airport development needs in the State of Alaska."}],"Letting":{"LettingDate":"2026-08-04T00:00:00-08:00","LettingStatus":"S","BLDT2":"2026-07-14T15:25:00-08:00"},"PrimaryRefDistrict":{"Description":"Central Region"},"Community":"","OJT":"None","addNumber":"","addDate":"","estRange":"Greater than $1,000,000","estRangeVal":8}]}