Tok Cutoff MP 38-50 Rehabilitation
Project No. NFHWY00147/0A13021

Project Documents

The project is still in the early stages, and we’re in the process of gathering data needed for design. Project documents will be posted here when they’re available. Check this website for updates as new information is posted, subscribe to our email list, or emailemail our project manager.


Environmental Information

Agency Scoping PDF file 6MB

Environmental Document – appendices not included PDF file 1MB

Wetlands Report PDF file 120MB

Right-of-Way Information

Our Right-of-Way Engineers are working to compile known right-of-way information and should produce an updated right-of-way map soon. When the updated right-of-way map is completed, we will post that information here.

Right-of-way map, 1982, project F-I-OA1-3(1) PDF file 13MB

Location Survey

A topographic and planimetric survey of the project corridor is underway. When the location survey is completed, we will post that information here.

Record of Survey(will be posted here when available)

Survey CAD drawing (will be posted here when available)

Bridge Rehabilitation

Memorandum – 3R analysis PDF file <1MB

Preliminary Bridge Plans PDF file 1MB

Preliminary Design

May 2017 Reconnaissance Trip Report PDF file 2MB

As-built drawings, 1986, project F-IR-OA1-3(1) PDF file 50MB

Design Study Report (will be posted here when available)

CMGC

CMGC Handout PDF file <1MB

CMGC Meeting Recording video file 129MB