Steese Expressway / Johansen Expressway Interchange

Alternatives

The full Alternatives Report is available under Project Information on the right side of the page. Twelve alternatives were analyzed to address the issues identified at the previous open house. Click the links below for details on each alternative.

Proposed Build Alternatives

Alternatives Considered but Dismissed

Table 1. Comparison of Estimated Intersection Delay under each Proposed Alternative [PDF]

Table 1 Legend
Alternative Peak Hour Vehicle Delay Peak Hour Pedestrian Delay

Alternative A No Build

alternative a vehicle delay alternative a pedestrian travel path and delay

Alternative B Enhanced Conventional Intersection

alternative b vehicle delay alternative b pedestrian travel path and delay

Alternative E Farmers Loop Connection

alternative e vehicle delay alternative e pedestrian travel path and delay

Alternative F Left Turn Flyover (Partial Interchange)

alternative f vehicle delay alternative f pedestrian travel path and delay

Alternative G1 Tight Diamond (Full Interchange)

alternative g1 vehicle delay alternative g1 pedestrian travel path and delay

Alternative G3 Diverging Diamond (Full Interchange)

alternative g3 vehicle delay alternative g3 pedestrian travel path and delay

Alternative H1 Full Echelon (Partial Interchange)

alternative h1 vehicle delay alternative h1 pedestrian travel path and delay

Alternative H2 Partial Echelon (Partial Interchange)

alternative h2 vehicle delay alternative h2 pedestrian travel path and delay